Taezhnaya substation

Automated process control system, automated power consumption control and measurement system, relay protection

and automation equipment of the Taezhnaya substation for Amur Minerals


Voltage
500 kV

Solutions used
Automation of a power facility
Relay protection and automation

Hardware and software
APCS of the substation; Automated power consumption control and measurement system based on ProsoftSystems; relay protection and automation equipment based on Ekra;220 kV SF6 dead tank circuit breaker (4 pcs.); 220 kV disconnect switch (11 pcs.); 500 kV voltage transformer (6 pcs.);220 kV current transformer (8 pcs.);220 kV bus support insulators (55 pcs.);0.4 kV auxiliary switchboard;10 kV, 630 A, 2000 A, 3150 A, 5000 A cast insulation busbars (517 m total length);10 kW, 5,000 A and 63 kA integrated switchgear equipment (generator cells)
Full range of services for the operation, maintenance, and supply of spare parts and process fluids
Supervised installation of the automated process control system of the substation and the automated power consumption control and measurement system.
Emergency control automatics.
Relay protection and automation.
Commissioning and start-up.

"Competent, well-qualified specialists that not only fulfill every single task but also suggest on improving the existing equipment systems.Regular HSE improvement events."

— A.N. Sychev, Capital City LLC CEO

Submit Request
Tell us about your objectives and we’ll make you an offer that will save you money on electricity Or you can invite us to tender ⟶